Deployment of modules

Apart from Matsushita’s ongoing production of small screen-printed modules at a rate of 1 MWp per annum, a number of modules and arrays have been installed from other
industrial pilot-line production efforts (Zweibel et al., 1996). Golden Photon Inc. has installed CdTe systems of total capacity -100 kWp, mainly for water pumping. Two 25 kWp CdTe installations, supplied by Golden Photon Inc. and Solar Cells Inc., have been deployed at China Lake, California. SCI has also deployed two 10 kWp grid – connected arrays at Davies, California and in Toledo, Michigan, and supplied four nominal 1 kWp arrays to NREL, Toledo Edison (2 arrays) and Tunisia.

Leave a reply

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>